Macedonian–English project management glossary

The terms the profession uses — in Macedonian and in English, explained in a sentence or two. No Macedonian term here was coined by us: each one is taken from a published source, and the source is named next to it.

165terms33 still without a Macedonian source

A

  1. Acceptance criteria

    Macedonian term wanted

    The conditions a deliverable must meet before it is accepted.

    Source[1]

  2. Accountability

    отчетност

    Answering for the result — it can be assigned to one person and, unlike responsibility, cannot be delegated.

    Source[3][4]

  3. Activity

    активност

    A distinct, scheduled portion of work performed during the project.

    Source[3][4][12]

  4. Adaptation

    прилагодување

    also: адаптација

    Adjusting the process or the product as soon as inspection shows it has drifted outside acceptable limits.

    Source[2][12]

  5. Adaptive approach

    Macedonian term wanted

    A development approach in which requirements evolve and the work is delivered in iterations. Agile is adaptive.

    Source[1]

  6. Agile

    агилен

    An approach to work that delivers in short cycles, welcomes changing requirements and adapts based on feedback.

    Source[2]

  7. Approval

    одобрување

    Formal acceptance of a plan, deliverable or change by whoever has the authority to give it.

    Source[4][12]

  8. Artifact

    артефакт

    A work product that carries information — in Scrum, the Product Backlog, Sprint Backlog and Increment.

    Source[2][12]

  9. Assumption

    претпоставка

    A factor considered true for planning purposes without proof; if it turns out false, the plan changes.

    Source[3][4]

  10. Audit

    ревизија

    An independent examination of whether project activities and records comply with the agreed rules.

    Source[3][12]

B

  1. Backlog

    листа на планирани активности

    An ordered list of everything that might be needed in the product, or the subset chosen for a sprint.

    Source[2]

  2. Baseline

    основна линија

    also: основа

    The approved version of a plan (scope, schedule or cost) that actual performance is measured against.

    Source[3][4][12]

  3. Beneficiary

    корисник

    Those who benefit from the project, directly or in the longer term.

    Source[3]

  4. Benefit

    придобивка

    also: корист

    A positive, measurable gain for the organisation or its stakeholders that the project is meant to produce.

    Source[3][12]

  5. Bottleneck

    Macedonian term wanted

    The step in a workflow whose limited capacity holds back everything after it.

    Source[1]

  6. Budget

    буџет

    The approved estimate for the project or any part of it.

    Source[5][4][12]

  7. Business case

    Macedonian term wanted

    A documented justification for a project, weighing its expected benefits against its cost.

    Source[1]

C

  1. Call for proposals

    повик за доставување предлози

    A public invitation to submit project proposals for funding.

    Source[3]

  2. Change control

    контрола на промени

    The process by which changes are identified, documented, approved or rejected.

    Source[4]

  3. Change management

    управување со промени

    Managing the effect of change on people, processes and the plan so the project keeps delivering.

    Source[4][8]

  4. Change request

    Macedonian term wanted

    A formal proposal to modify a document, deliverable or baseline.

    Source[1]

  5. Closing

    затворање

    Formally completing or ending a project, phase or contract.

    Source[10][4][8]

  6. Commitment

    обврска

    A formal promise — of funds, of a result, of a scope of work.

    Source[2][3]

  7. Communication plan

    Macedonian term wanted

    Who needs what information, when, in what form and from whom.

    Source[1]

  8. Constraint

    ограничување

    A limiting factor — time, budget, resources, regulation — that the project must work within.

    Source[4][12]

  9. Contingency plan

    резервен план

    A plan of actions to take only if a specific risk occurs.

    Source[3]

  10. Contingency reserve

    резерва

    Time or money set aside within the baseline for identified risks.

    Source[4][12]

  11. Contract

    договор

    A binding agreement that obliges the seller to deliver and the buyer to pay.

    Source[3][12]

  12. Contracting authority

    нарачател

    The body that runs the tender, awards and signs the contract.

    Source[3]

  13. Contractor

    изведувач

    The organisation or person awarded a contract to carry out the work.

    Source[3]

  14. Cost

    трошок

    also: трошоци

    The money spent or committed to complete the work.

    Source[3][12]

  15. Cost-benefit analysis(CBA)

    анализа на исплатливост на трошоците

    A comparison of a project’s costs and benefits over time, with and without the project, to judge whether it pays off.

    Source[3]

  16. Crashing

    Macedonian term wanted

    Shortening the schedule by adding resources, at added cost.

    Source[1]

  17. Critical path

    критичен пат

    The longest sequence of dependent activities, which sets the shortest possible project duration.

    Source[4][11][8]

  18. Critical path method(CPM)

    метод на критичен пат

    A scheduling technique that calculates the earliest and latest dates for each activity to find the critical path.

    Source[4]

  19. Cross-functional

    крос-функционалност

    A team that has all the skills needed to create value each sprint, without depending on others.

    Source[2]

D

  1. Daily Scrum

    Дневен Scrum

    A 15-minute daily event for the Developers to inspect progress toward the Sprint Goal and adapt the plan.

    Source[2]

  2. Definition of Done(DoD)

    Дефиниција за Завршено

    The shared description of the quality a piece of work must reach before it counts as part of the increment.

    Source[2]

  3. Deliverable

    испорака

    also: резултат

    Any unique, verifiable product, result or capability that must be produced to complete a process, phase or project.

    Source[4]

  4. Dependency

    зависност

    A logical relationship in which one activity cannot start or finish until another has.

    Source[4][12]

  5. Developers

    Девелопери

    In Scrum: the people committed to creating a usable increment each sprint, whatever their specialism.

    Source[2]

  6. Duration

    времетраење

    also: траење

    The number of work periods needed to complete an activity.

    Source[3][4][12]

E

  1. Earned value(EV)

    Macedonian term wanted

    The value of the work actually completed, expressed in terms of the approved budget.

    Source[1]

  2. Earned value management(EVM)

    Macedonian term wanted

    A method that combines scope, schedule and cost measurements to assess project performance and forecast the outcome.

    Source[1]

  3. Effectiveness

    ефективност

    The extent to which the objectives were achieved.

    Source[3]

  4. Efficiency

    ефикасност

    How well inputs were turned into outputs — results relative to cost and time.

    Source[3]

  5. Empiricism

    емпиризам

    The principle that knowledge comes from experience and decisions are made on what is observed — the basis of Scrum.

    Source[2]

  6. Escalation

    ескалација

    Raising an issue or decision to a higher level of authority when it cannot be resolved at the current one.

    Source[12]

  7. Estimate

    проценка

    A quantified assessment of the likely cost, duration or resources for a piece of work.

    Source[4][12]

  8. Evaluation

    евалуација

    also: оценување

    A periodic assessment of a project’s efficiency, effectiveness, impact, sustainability and relevance against its objectives.

    Source[3][5][12]

  9. Ex-post evaluation

    екс пост евалуација

    An evaluation carried out after the project has ended, to judge its actual results and impact.

    Source[6]

  10. Executing

    извршување

    Carrying out the work defined in the plan.

    Source[10][8]

F

  1. Fast tracking

    Macedonian term wanted

    Shortening the schedule by doing activities in parallel that would normally be done in sequence.

    Source[1]

  2. Feasibility study

    физибилити-студија

    A study, done before approval, that checks whether a proposed project is technically, financially and organisationally viable.

    Source[3][6]

  3. Float

    Macedonian term wanted

    How long an activity can be delayed without delaying the project finish (total float) or the next activity (free float). Also called slack.

    Source[1]

  4. Forecast

    прогноза

    An estimate of future conditions or results based on what is known today.

    Source[12]

G

  1. Gantt chart

    Гантов дијаграм

    also: гантограм; гант чарт

    A bar chart of schedule information: activities down the side, dates across the top, durations as bars.

    Source[3][9][4]

  2. Governance

    Macedonian term wanted

    The framework of authority, decision rights and oversight within which a project is run.

    Source[1]

  3. Grant

    грант/неповратна помош

    A direct, non-commercial payment to finance an action, with no repayment expected.

    Source[3]

H

  1. Hybrid approach

    Macedonian term wanted

    A combination of predictive and adaptive elements chosen to fit the project.

    Source[1]

I

  1. Impact

    влијание

    The effect on objectives if a risk occurs; in evaluation, the long-term consequence of a project.

    Source[3][7][12]

  2. Implementation

    спроведување

    also: имплементација

    Putting the plan into effect — the phase in which the project’s outputs are actually produced.

    Source[6][3][4]

  3. Inception report

    почетен извештај

    In EU-funded projects: the first report, at the end of the start-up period, which updates the design and sets the work plan.

    Source[3]

  4. Increment

    Инкремент

    also: Прираст

    A concrete, usable step toward the Product Goal, added to all previous increments and verified against the Definition of Done.

    Source[2]

  5. Indicator

    показател

    A measurable variable used to show whether an objective is being reached.

    Source[3][12]

  6. Initiating

    иницирање

    The work done to define a new project or phase and obtain authorisation to start it.

    Source[10][4][8]

  7. Inspection

    испитување

    also: проверка; инспекција

    Frequently and carefully examining the artifacts and progress to detect undesirable variances.

    Source[2][12]

  8. Issue

    Macedonian term wanted

    A current condition or situation that may affect the project objectives — a risk that has happened, or a problem being worked.

    Source[1]

  9. Iteration

    Macedonian term wanted

    A short, fixed period in which a usable piece of the product is produced. A sprint is an iteration.

    Source[1]

K

  1. Kanban

    Macedonian term wanted

    A method that visualises work on a board, limits work in progress and manages flow rather than fixed iterations.

    Source[1]

  2. Kick-off meeting

    Macedonian term wanted

    The meeting that marks the start of a project or phase, aligning the team and stakeholders on objectives, roles and plan.

    Source[1]

L

  1. Lean

    Macedonian term wanted

    A way of working that reduces waste and focuses on what creates value for the customer.

    Source[1]

  2. Lessons learned

    Macedonian term wanted

    Knowledge gained during a project about what worked and what did not, recorded so future projects benefit.

    Source[1]

  3. Logical framework(Logframe)

    логичка рамка

    also: логична рамка

    A matrix summarising a project: objectives, results, activities, indicators, sources of verification and assumptions.

    Source[3][5]

  4. Logical framework approach(LFA)

    приод на логичка рамка

    The planning method behind the logframe: stakeholder, problem, objective and strategy analysis, then the matrix and schedules.

    Source[3]

M

  1. Milestone

    одредница

    also: главен настан; пресвртница

    A significant point or event in the project, with no duration of its own.

    Source[3][4][12]

  2. Minimum viable product(MVP)

    Macedonian term wanted

    The smallest version of a product that delivers value and yields learning about what to build next.

    Source[1]

  3. Monitoring

    следење

    also: мониторинг

    The systematic, continuous collection and use of information on progress for management and decisions.

    Source[3][8][12]

  4. Monitoring and controlling

    мониторинг и контрола

    Tracking, reviewing and regulating progress and performance, and managing changes to the plan.

    Source[10][8]

N

  1. Network diagram

    мрежен дијаграм

    A graphical representation of the logical relationships among the schedule activities.

    Source[9][4][12]

O

  1. Objective

    цел

    Something toward which work is directed — a result to be reached, a position to be attained.

    Source[3][12]

  2. Outcome

    резултат

    also: исход

    The change that results from using the project’s outputs.

    Source[3][12]

  3. Output

    излезни резултати

    What the project directly produces — a partial or complete product of an activity.

    Source[3]

  4. Overall objective

    општа цел

    In the logical framework: the long-term benefit to society that the project contributes to but does not deliver alone.

    Source[3]

  5. Ownership

    сопственост

    The active involvement of the beneficiaries in a project so that its results are theirs to keep, not the donor’s.

    Source[3]

P

  1. Phase

    фаза

    A set of logically related project activities that ends with the completion of one or more deliverables.

    Source[3][5][4]

  2. Planning

    планирање

    Establishing the scope, refining the objectives and defining the course of action needed to reach them.

    Source[10][4][8]

  3. Portfolio

    Macedonian term wanted

    The collection of projects, programs and operations an organisation manages as a group to meet strategic objectives.

    Source[1]

  4. Predictive approach

    Macedonian term wanted

    A development approach in which scope, time and cost are set early and the work follows the plan. Also called waterfall.

    Source[1]

  5. Probability

    веројатност

    How likely a risk is to occur.

    Source[7]

  6. Procurement

    набавка

    also: набавки

    Obtaining goods, services or works from outside the project team.

    Source[3][7][12]

  7. Product

    производ

    also: продукт

    The tangible or intangible thing the work produces — an item, a service, a system.

    Source[2][3]

  8. Product backlog

    Листа на планирани активности за Продуктот

    The single, ordered list of work needed to improve the product; the one source of work for the Scrum Team.

    Source[2]

  9. Product goal

    Цел на Продуктот

    The future state of the product the Scrum Team is planning toward — the commitment attached to the Product Backlog.

    Source[2]

  10. Product owner

    Сопственик на продуктот

    The one person accountable for maximising the value of the product and for managing the Product Backlog.

    Source[2]

  11. Program

    програма

    A group of related projects managed together to obtain benefits that would not come from managing them separately.

    Source[3][12]

  12. Program evaluation and review technique(PERT)

    PERT

    An estimating technique that weights optimistic, most likely and pessimistic estimates for each activity.

    Source[4]

  13. Progress report

    извештај за напредокот

    A report on what has been done in a period, what is next and what is blocking.

    Source[3]

  14. Project

    проект

    A temporary piece of work with a defined start and end, undertaken to create a unique product, service or result.

    Source[3][13][8]

  15. Project charter

    проектна повелба

    The document that formally authorises a project and gives the project manager the authority to apply resources to it.

    Source[10][12]

  16. Project cycle

    проектен циклус

    In EU-funded work: the sequence from programming and identification through formulation, financing, implementation and evaluation.

    Source[3][5]

  17. Project cycle management(PCM)

    управување со проектен циклус

    also: раководење со проектен циклус

    The EU methodology for preparing, implementing and evaluating projects along the project cycle, built on the logical framework.

    Source[3][5]

  18. Project life cycle

    проектен животен циклус

    also: животен циклус на проектот

    The series of phases a project passes through from start to finish.

    Source[4]

  19. Project management

    управување со проекти

    also: проектен менаџмент; раководење со проекти

    Applying knowledge, skills, tools and techniques to project work so that it meets its requirements.

    Source[4][8][12]

  20. Project management office(PMO)

    Macedonian term wanted

    A unit that standardises project governance and shares methods, tools and resources across projects.

    Source[1]

  21. Project management plan

    проект менаџмент план

    also: проектен план

    The document describing how the project will be executed, monitored and controlled — it brings the subsidiary plans together.

    Source[4]

  22. Project manager(PM)

    проектен менаџер

    also: раководител на проект

    The person assigned to lead the team and be accountable for reaching the project objectives.

    Source[3][4]

  23. Project purpose

    цел на проектот

    In the logical framework: the central objective — the change for the target group that the project is directly responsible for.

    Source[3]

  24. Project team

    проектен тим

    The people who do the project work.

    Source[9][4]

  25. Prototype

    прототип

    An early working model built to test an idea before the real thing is made.

    Source[12]

Q

  1. Quality

    квалитет

    The degree to which a deliverable meets its requirements.

    Source[4][12]

  2. Quality assurance(QA)

    Macedonian term wanted

    Making sure the processes used are the right ones and are being followed, so that quality is built in rather than inspected in.

    Source[1]

  3. Quality control(QC)

    контрола на квалитет

    Checking deliverables against requirements and recording the results.

    Source[4]

R

  1. Relevance

    релевантност

    Whether the project’s objectives match the real problems, needs and priorities.

    Source[3]

  2. Reporting

    известување

    Regularly informing stakeholders about progress, spending and risks.

    Source[6][7]

  3. Requirement

    барање

    A condition or capability that a product, service or result must satisfy.

    Source[3][12]

  4. Resource

    ресурс

    People, equipment, materials, money or facilities needed to do the work.

    Source[3][4][12]

  5. Resource leveling

    Macedonian term wanted

    Adjusting the schedule so that resource demand does not exceed what is available, usually by shifting activities.

    Source[1]

  6. Responsibility

    одговорност

    The duty to perform a piece of work.

    Source[4][12]

  7. Responsibility assignment matrix(RAM / RACI)

    матрица за правила и одговорности

    A grid showing which role is responsible, accountable, consulted and informed for each piece of work.

    Source[4]

  8. Result

    резултат

    In the logical framework: the tangible products or services delivered as a consequence of the activities.

    Source[3][4]

  9. Retrospective

    ретроспектива

    A regular meeting in which a team reflects on how it worked and agrees what to improve.

    Source[2]

  10. Risk

    ризик

    An uncertain event or condition that, if it occurs, has a positive or negative effect on one or more objectives.

    Source[3][7][4][12]

  11. Risk assessment

    проценка на ризици

    also: анализа на ризик

    Estimating the probability and impact of each identified risk so they can be prioritised.

    Source[6][4]

  12. Risk management

    управување со ризици

    Identifying, analysing and responding to risk throughout the project.

    Source[3][7][4]

  13. Risk register

    регистар на ризици

    The document in which identified risks are recorded together with their analysis and planned responses.

    Source[7]

S

  1. Schedule

    временски распоред

    also: распоред

    The planned dates for performing activities and meeting milestones.

    Source[4][12]

  2. Scope

    опсег

    also: обем; делокруг

    The sum of the products, services and results a project will deliver — and, just as importantly, what it will not.

    Source[4][10][12]

  3. Scope creep

    Macedonian term wanted

    Uncontrolled growth of the scope without matching adjustments to time, cost and resources.

    Source[1]

  4. Scrum

    Scrum

    A lightweight framework for solving complex problems in fixed-length sprints with three roles, five events and three artifacts.

    Source[2]

  5. Scrum master

    Scrum Мастер

    The person accountable for making Scrum work — for the team, the Product Owner and the organisation.

    Source[2]

  6. Scrum team

    Scrum Тим

    A small, cross-functional, self-managing team: one Scrum Master, one Product Owner and the Developers.

    Source[2]

  7. Self-managing

    само-управување

    A team that decides internally who does what, when and how.

    Source[2]

  8. Sensitivity analysis

    анализа на чувствителност

    Testing how much a project’s outcome changes when key assumptions (cost, demand, timing) change.

    Source[6]

  9. Servant leadership

    Macedonian term wanted

    Leading by removing obstacles and serving the team’s needs rather than directing it.

    Source[1]

  10. Sources of verification

    извори на верификација

    In the logical framework: where and how the information for each indicator will be obtained.

    Source[3]

  11. Sprint

    Спринт

    A fixed-length event of one month or less in which the team turns a selection of backlog items into a usable increment.

    Source[2]

  12. Sprint backlog

    Листа на планирани активности за Спринтот

    The Sprint Goal, the Product Backlog items selected for the sprint, and the plan for delivering them.

    Source[2]

  13. Sprint goal

    Цел на Спринтот

    The single objective for the sprint — the commitment attached to the Sprint Backlog.

    Source[2]

  14. Sprint planning

    Планирање на Спринтот

    The event that opens a sprint: why it is valuable, what can be done, and how the work will get done.

    Source[2]

  15. Sprint retrospective

    Ретроспектива на Спринтот

    The event that closes a sprint: the team looks at how it worked and plans improvements.

    Source[2]

  16. Sprint review

    Преглед на Спринтот

    The event near the end of a sprint in which the team and stakeholders inspect the increment and adapt the Product Backlog.

    Source[2]

  17. Stakeholder

    засегната страна

    also: учесник; интересент

    Anyone who can affect, be affected by, or believe themselves affected by the project.

    Source[2][6][3][4][10]

  18. Stakeholder analysis

    анализа на учесниците

    Systematically identifying stakeholders and their interests, influence and expectations.

    Source[3]

  19. Statement of work(SOW)

    Macedonian term wanted

    A narrative description of the products, services or results to be delivered, often attached to a contract.

    Source[1]

  20. Status report

    извештај за проектен статус

    A periodic report on where the project stands against its plan.

    Source[4]

  21. Steering committee

    управен комитет

    also: проектен одбор

    A group of senior stakeholders that oversees the project, takes decisions above the project manager’s authority and resolves escalations.

    Source[3]

  22. Sustainability

    одржливост

    The likelihood that the project’s benefits continue after the project — and its funding — ends.

    Source[3][5]

T

  1. Tailoring

    Macedonian term wanted

    Deliberately choosing and adjusting processes, methods and artifacts to suit the specific project.

    Source[1]

  2. Target group

    целна група

    The group the project is meant to positively affect at the level of its purpose.

    Source[3]

  3. Task

    задача

    A unit of work; in many tools the smallest thing that gets assigned and tracked.

    Source[3][12]

  4. Tender

    тендер

    A formal offer to supply goods or services at an agreed price, made in response to an invitation.

    Source[3]

  5. Terms of reference(ToR)

    опис на задачи

    also: проектна задача

    A document defining the tasks required of a contractor: background, objectives, activities, inputs, outputs, budget and timetable.

    Source[3][4]

  6. Timebox

    временски ограничен

    A fixed maximum length of time for an event or piece of work; when the time is up, it ends.

    Source[2]

  7. Transparency

    транспарентност

    Making the process and the work visible to everyone who needs to see it.

    Source[2][3][12]

  8. Triple constraint

    Macedonian term wanted

    The classic trade-off between scope, time and cost: changing one affects the others.

    Source[1]

U

  1. User story

    Macedonian term wanted

    A short, plain-language description of a feature from the user’s point of view: who wants it, what, and why.

    Source[1]

V

  1. Value

    вредност

    The worth, importance or usefulness of something — the reason the work is done at all.

    Source[2][12]

  2. Variance

    Macedonian term wanted

    A measurable departure from the baseline — in cost, schedule or scope.

    Source[1]

  3. Velocity

    Macedonian term wanted

    The amount of work a team completes per iteration, used to forecast how much it can take on next.

    Source[1]

W

  1. Work breakdown structure(WBS)

    структура за поделба на работата

    also: структура на поделба на проектната работа

    A hierarchical breakdown of the total scope of work into smaller, manageable pieces.

    Source[4]

  2. Work package

    работен пакет

    The lowest level of the WBS — a piece of work for which cost and duration can be estimated and managed.

    Source[4]

  3. Work plan

    план за работа

    The schedule of activities and resources needed to reach the project’s results and purpose.

    Source[3]

  4. Workflow

    тек на работа

    also: работен тек

    The sequence of steps a piece of work passes through from start to done.

    Source[4][12]

Sources

The rule of this glossary: a Macedonian term is included only if it was found in a published source. Sources are ranked by weight — standards and official documents, then course material, then general dictionaries.

  1. [1]
  2. [2]
    The Scrum Guide (2020), Macedonian translation

    Schwaber & Sutherland; translated by V. Petrevski, A. Petrevska · 2020

  3. [3]
  4. [4]
    Project Management Handbook (Basics of Project Management)

    A. Bogdanovska Gj., Centre for Knowledge Management, Skopje · 2020

  5. [5]
    Handbook on EU Project Design and Project Cycle Management

    R. Papadimitrov, I. Nikolovski, IDSCS (EU-funded project) · 2017

  6. [6]
  7. [7]
    Handbook on Financial Management and Control

    Ministry of Finance, PIFC department

  8. [8]
  9. [9]
    Course “Project Management” (MGT 370), syllabus

    Faculty of Economics — Skopje, UKIM

  10. [10]
  11. [11]
  12. [12]
  13. [13]

The English terms follow the PMI Lexicon of Project Management Terms; the explanations are ours, in our own words, not a translation of PMI’s.

Spotted a mistake, or know a better term?

The glossary is a living document of the chapter. Write to us with the term and the source you met it in.